QM

These days a good and well organized company acting as MANUFACTURER OR FABRICATOR cannot coop with the procurement conditions for enquiries of large companies when you have NO QUALITY SYSTEM (QM). You should have your OWM QM SYSTEM which can be related to guidelines from the ISO 9001/2 and EN rules your QM will be accepted by Oil companies ,Procurement Groups , and Certification Societies or NoBo -Notify Bodies. NEW -How Good is your product ,ie whats mean Good in a level , some major procurement groups mentioned their requirement for an level of FMECA-8 ! 80% do not where we speaking about. (FEMCA stays for :Failure /Mode/Effect / Critical /Analyse. Contact : STOUCO CONSULTANCE BV).

-----------------------------------------------------

Large companies or procurement groups required a Audit /Hazop on your company it would be nice for your company and staff when you can show your QUALITY MANUAL . 

A Stouco tailor made QM is based on your Company and comprise mainly the following groups:

01)- INTRODUCTION .

02)-ORGANIZATION & CHART .
03)-INDUSTRIAL AREA,s AND PRODUCTS.
04)-GROUPS:

100)- Steel made Equipment .
200)- Rotating parts.
300)-Hoisting and Pulling.
400)-Hydraulics.
450)-Power sources.
500)-Interfaces.
600)-Electrics.
700)-Control-systems.
800)-Load systems
900)-Fail safes.
1000)-Allumination.
1100)-Cylinders.
1200)-Assemblies ,Torque sheets.
1300)-Bogies.
1400)-Fluids.
1500)-Waste and Disposal.
1600)-Serial plates.
1700)-Naval Architecture.
1701)- Land rigs.
1702)-Skidding Devices.
1703)-Jack ups ,drilling & Mooring.
1704)-Draw works.
1705)-Reels and Couplings. (STAKAP)
1706)- Drilling package , on Jack up.
1707)-Semisubmersible ,Drilling. (STRILL)
1708)- Production platform.
1709 )-General Drilling Package , (China Drilling).
1710)- Gangways ,Passenger Bridges.(STAB)
1711)-Diving Systems.
1713)-Dredger Equipment.
1714)-Diving Support Vessels.
1718)-Carrier for Windmills.
1719)-ROV ship.
1720)-Tanker Loading Booms.
1721)-Ship Lift Dock. (DMST)
1722)-Cranes.
1723)-Winches. (STINCH).
1724)-Module Trainer .
1725)-Equipment for Yachting.
1726)-Drillship.
1727)-Hyperbaric Technology. (SPHL)
1728)-Standby Semi.

1729)-Launch /Transport Barge.
1732)-Oil Skimmer Vessel.
1736)-Sand Unloading system.
1738)-Tower on Quay.
1739)-Crane parts / DESIGN ONLY.
1740)-Floating Dry-dock for Semi,s.
1740)- Cherry Picker.
1744)-Resque Systems for Submarine U206.
1745)-Amusement products.
1747)-Truck Tire Changer (TTC).
1749)-Resquer.
1750)-BHS ,low pressure.
1751)-CALM.
1752)-Dome Catcher.
1753)-Rack & Pinion systems ,M100.
1754)-Rotary tables /Carousels.
1755)-Specials.

05)-QUALITY SYSTEM. (QA23)

05.1)-QA =Quality Assurance..................................QA
05.2)-QC =Quality Control.
05.3)-QIP =Quality Inspection Plan
05.4)-QCP =Quality Control Plan.............................QA24
05.5)-QTP =Quality & Test Plan...............................QA25
05.6)-MDB =Manufacturing Data Book..........*.........QA9
05.7)-MS =Material Specification.
05.8)- WPS / WPQ/PQR/NDE/DE/LPE .
05.11)-LOC =Letter of Conformity..............................QA6
05.12)- OG =Origin of Goods......................................QA7
05.13)-DS =Data Sheets..............................................QA67
05.14) -MRT=Manufacturing Running Test................ QA69
05.17)-NU = New and unused.....................................QA89

06)- FAT /FAS and FAST.Procedures. ( 05.10)

Factory Acceptance Test.............................................QA22

07)-DOCUMENTATION :

08)- WELDING ...............................AWS /DIN / ASME / API / EN ISO3834
Welders are certified (min.3G level) acc. to QA 39 /40 /41/ 42/ 43/

09)-OPTIONALS.
A normal QM is based on about 100 pieces QA + DS. and different divisions of your company ,for example :
Dutch company Kingmetaal ,OM-book : I= Machining department.
II=Construction + Welding dept.
III =Plating department.
IV =Hyperbaric Vessels (63 bar).
An typical Stouco QA list is attached herewith (ref.Brevini QM 0808-Summ.sheets)